Customization: | Available |
---|---|
After-sales Service: | Our Engineer Can Go to Customer Factory to Install |
Warranty: | 2 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Material type: roll like materials such as self-adhesive, paper, non-woven fabric, film, printing composite, etc;
Part Name | Specification, | Quantity | Brand |
45# steel frame | wall panel thickness 40mm | 1 | chrome plating |
3" air shaft | chrome plating | 2 | |
Main traction steel roller for chrome plating | φ120*1150mm | 1 | |
Main traction rubber roller for polyurethane | φ120*1150mm | 1 | |
Hard alumina guide roller | Φ90*1150mm | 10 | |
Rewind servo | 5.5KW | 2 | meishike |
traction servo | 5,5KW | 1 | meishike |
driver | 5.5kw | 3 | Shenzhen hongyuan |
Waste blowing edge fan | 1.5KW | 1 | wuxi |
bearing | some | HRB | |
pneumatic components | some | ||
round knives with heating function | 8 sets | ||
Main PLC programmable controller | CPU224XP | 1 | siemens |
10 inch true color touch screen | TPC1061Ti | 1 | Beijing Kunlun tongtai |
Proximity switch | 1 | Japan OMRON | |
low-voltage electrical appliances | 1 | Schneider | |
Switching power supply | S100-24 | 1 | Taiwan Mingwei |
Upper and lower center rewinding diameter 1000mm |
Q: Are you manufacturer or trading company?
A:We are the manufacturer and have our own workers and factories.
Q:How long is the warranty period?
A: All of our products have 2 year warranty and whole life maintance
Q: What's the main market of your company?
A: We have customers all over the world
Q: What's your delivery time and payment Terms?
A: Normally,it need about 10-30 days.The exact time depends on your quantity.The payment terms always 30% deposits,70% to be paid before shipment.
Q: What package do you use for the product?
A:Be Coated with anti-corrosion oil, and covered with plastic film, wooden box package need extra cost.
Q: Does your factory provide installation service?
A:Our engineer can go to customer factory to installation . buyer should prepare materials used to testing the machine in advance and should be responsible for the cost of supplier's technician, including round air tickets, visa cost, accommodation and salary 120-150USD/Day per person since the day start out until the day arriving at factory.
Q: Can we visit your machine operation in your factory?
A: Welcome to you go to our factory to see the machine operation.
Q: Where's your factory located? How can we visit there?
A: We are in Zhixin industry Zone, Ruian City,Zhejiang province,China.
You can by air to Wenzhou airport and by High-speed train to Rui'an Station